John's ladder braced grand concert of walnut and western red cedar.
Sides loaded into the side bender and warming
Sides heated, bent and now cooling
The sides have been fitted into the mold and the neck and heel blocks have been glued in.
Back with center strip installed.
Kerfed linings clamped in.
Colorful side reinforcement.
Top and back plates.
Back braces clamped in the go-bar deck.
Bracing the top.
Finishing up the back braces.
Installing purflings and bindings
Installing purflings and bindings
Ready for scraping and sanding
The box is pretty much done now and I'll be starting on the neck.
Purfling/Rosette closeup
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment