Thursday, June 7, 2012
Finishing up the box
Routing the purfling and binding channel
installing the binding and purfling
Scraping the binding
Adding the headstock overlay (ebony).
The box and the neck blank.
Routing the dovetail mortis.
And the tenon in the neck
Ready for final neck fitting.
And the fit is good!
Shaping the neck with pull knife, rasps and sanding drum.
Rechecking the fit.
The fit is still good!
Back of the headstock.
Some other views.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment